It has been over 2 months since the last entry. I’m very
sorry to all concerned for the silence. The care of the construction has taken
me without rest, leaving little time for other matters.
Today, 2.5 months after the start of construction, I
can proudly look at the result: 8 out of 10 scheduled cottages are ready,
outbuildings are ready to be covered with the rooftops, and the area is
surrounded by a beautiful stone wall.
Young, muscled men excavated a huge hole
for the pool. The swimming pool has been
designed with a direct ocean view. It will be nice to sit down on his edge with
a drink in hand and to enjoy the ocean, glittering with many shades of Sapphire
and turquoise. We also thought about the small guests – part of the pool will
be shallower, allowing safe water games.